BSL-3 Microbiology Laboratory Lublin, Poland
In Lublin, a BSL3 class Microbiological Laboratory was established for the Provincial Sanitary and Epidemiological Station in Lublin. The investment will strengthen the infrastructure of the WSEZ Academy in Lublin as a key and strategic core of the health care system in the fight against COVID-19 and other infectious diseases and related epidemic crisis situations.
HT Group planned and built the BSL-3 lab area with 3 laboratories with a total area of 172 m².
The laboratory area was equipped with a hollow floor and ceiling-integrated HEPA filter technology.
Between the areas, 3 active material pass-through airlocks (with ventilation and fumigation connection) and 5 passive material pass-through airlocks were installed.
Construction | 05/2023-11/2023 |
Project team | Bernhard Somann, HT Group |
Architect | Mgr inż. Dorota Antosiewicz |
Solution | 3 BSL-3 laboratories, hollow floor, active material pass-through sluices (with ventilation and fumigation connection), passive material pass-through sluices, personnel sluice, corridors, ceiling-integrated HEPA filter technology |