Exclusive project visit to Rotthalmünster Hospital
Increase of an intensive care unit and bed ward
Together with the hospital and the architect (plus3 architekten), HT Group was able to welcome about 40 architects to a tour of the new building at the Rotthlmünster hospital on 05. Oktober 2022.
The visitors were given an insight into the planning and manufacturing processes in various presentations. Afterwards they had the opportunity to visit the new rooms.
According to a concept by plus-3 architects, a new extension was built for a new nursing station - due to the increased number of patients, a new bed wing was urgently needed, which was realized by raising the building by a new floor.
HT Group realized both the addition and the prefabricated building envelope with the connection to the existing buildings, as well as the entire interior finishing of the patient rooms and patient bathrooms.
The building envelope was built on top of the existing building using a modular construction method with prefabricated wooden elements and a rear-ventilated aluminum facade and connected to both the existing buildings.
Inside, 16 patient and isolation rooms with patient bathrooms, corridors, technical rooms and an intensive care area were built. The new ward impresses with a harmonious color concept with discreet but large-scale wall motifs. The intensive care area was equipped with the HT Cover healing light system and a special hygienic acoustic ceiling was installed to improve room acoustics.