X
Back to Overview

Klinikum Augsburg

Germany, Augsburg

  • Completion: 2014
  • Competences: Operating room
  • Solution: 16 ORs  · 2 Hybrid ORs  · HT Control  · preparation area & recovery area · doors & corridors
  • Design: LC glass
  • Area of ​​Expertise: Gynaecology  · Paediatric care  · Hybrid
  • Material: Glass
  • Protection: Fire protection
save as PDF

Description

Holistic planning was necessary for the rebuilding of the OR wing of the mother and child centre at the Klinikum Augsburg. The whole OR area was modernised in two construction stages without interrupting normal operations. Both the operations rooms and their pre-operative rooms, as well as the sterile corridor and its adjoining rooms, were completed by the HT Group. The whole process, from the planning stage to the completed rebuilding, lasted from September 2012 to July 2015. The first construction stage was completed in September 2013, the second stage was completed between October 2013 and July 2015. Here it was particularly important to ensure that the normal operations of the hospital were not hindered. Dust and dirt in particular or noise disturbances of the patients had to be avoided. The modular construction of the HT room systems proved extremely suitable for this purpose, as on the construction site itself it is only necessary for the substructure for the modular system parts to be set up and the pre-fabricated parts mounted.

X

Building Information Modelling (BIM)

Building Information Modelling provides new approaches for the planning and realisation of both construction projects and the operation of buildings. 
The HT Group supports users of the BIM method with modules and interfaces in the planning. Our BIM components are being continuously developed and adjusted to the latest state of technology. Revit components for your BIM model can be requested using the following contact form. ?We will be happy to answer any questions you may have on the subject of BIM planning.

Revit-Part for BIM-Model

BIM EN
Model*