X
Back to Overview

Jabar Al Ahmed Armed Forces Hospital

Kuwait, Kuwait

  • Completion: 2016
  • Competences: Operating room
  • Solution: 7 ORs · 2 recovery areas with 18 beds · Doors · Corridors · Furniture
  • Design: HT Control · HT Sky Ceiling
  • Material: Glass · metal
save as PDF

Description

In two construction phases the OR area of the Jabar Al Ahmed Armed Forces Hospital in Kuwait was completely renewed with a variety of materials used. All seven ORs were implemented in glass, the anterooms in stainless steel and corridors in galvanised steel combined with glass. In the first construction phase four ORs were renovated, in the second the three further ones. During construction the other ORs were in operation, which is a great challenge. The modular system makes it possible to cope with this task because the new modules are already prefabricated while the old ORs are teared off. This means shorter project times as well as less dirt, noise and disturbances on the construction site during assembly. The whole renovation was accomplished in only one year – from the first planning stage to the finished project. 

X

Building Information Modelling (BIM)

Building Information Modelling provides new approaches for the planning and realisation of both construction projects and the operation of buildings. 
The HT Group supports users of the BIM method with modules and interfaces in the planning. Our BIM components are being continuously developed and adjusted to the latest state of technology. Revit components for your BIM model can be requested using the following contact form. ?We will be happy to answer any questions you may have on the subject of BIM planning.

Revit-Part for BIM-Model

BIM EN
Model*