X

HT TURNKEY PROJECTS

SOLUTIONS FOR COMPLETE HOSPITALS

HT realises complex and high-quality projects in hospital and laboratory construction on a ready-to-use basis as part of a turnkey solution.

We draw up and supply holistic, inter-disciplinary solutions for hospital and laboratory complexes. A turnkey solution from HT Group
includes the entire management of a project from the project planning through the construction and the carrying out of the whole solution up to
the implementation of the equipment and subsequent maintenance service.

The HT Group is at your disposal during the course of the project as a skilled and reliable partner for the treatment of all complex issues.

EXPERIENCE & COMPETENCE

The HT Group combines many years of extensive experience and international partnerships.

Through our far-reaching skills we are capable of not only equipping individual clinical sections but also of realising turnkey projects for complete hospitals.

The work on all these areas is undertaken by us and selected system and project partners. You save on the search for and selection of potential suppliers, the main responsibility for planning and implementation is in the hands of the HT Group.

The modular form is used in all areas which permit it in order to efficiently and effectively guarantee quick completion and later modernisation.

OUR WORK

YOUR BENEFIT

Design, planning and construction are realised by HT together with selected partners,
if you wish we can also of course work together with your preferred partner.

  • Ready-to-use

    An HT turnkey solution means for you as a customer:

    // Short project durations
    // Less coordination effort
    // Minimum frictional losses
    // The highest quality standards for individual components, system solutions and services
  • Design

    // Planning and design of a building in collaboration with architects to your specifications

    // Interior architectural design

  • Planning

    // Building planning, room arrangement & interior architecture

    // Preparation of the project plan (project duration & costs)

    // Logistics planning

    // Agreement with the responsible authorities

  • Construction stage

    // Selection of suitable partners for the implementation

    // Predictable and short construction time due to modular form

    // Lower on-site cost due to prefabricated modules

    // High level of cost security

  • Technical equipment

    // Building equipment planning

    // Medical engineering planning for the OR area: Hardware and software

    // Completely equipped clean room zones (OR area, laboratory, sterilisation department)

    // Service/maintenance

Case study Venezuela

FOUR HOSPITALS – ONE SOLUTION

VENEZUELA, HOSPITAL GENERAL DE BARINAS

Four new state hospital were commissioned in 2011 in Venezuela, all four as turnkey solutions.

The special feature of these projects was that all four hospitals should have the same construction. This naturally simplifies the planning process and thus the project duration.

Together with partners, the HT Group completed the hospitals as turnkey solutions. From the design, planning up to the project management, service and maintenance the HT Group supplied a complete package. Thus, the customer had enormous cost security from the very beginning.

The first of the four hospitals was able to be completed in just a little more than 18 months.

THE CONCEPT

The two-storey building is constructed in such a way that treatment rooms, patient care and the intensive care unit are on the ground floor,
the patient rooms on the first floor.
Four quarters form the basic construction concept. Each of these quarters stands for a different form of patient care. One quarter is formed by the OR area, one by the intensive care unit and sterilisation department, one by the emergency room and one quarter by the area
"Consulta Externa" which is similar to a day-care hospital.

The construction is repeated on the first floor, three of the quarters are formed by patient wards, one includes the complete administrative area. The outside facade is covered with touches of colour, constructional elements provide shadow on the interior and the construction ensures that the building does not heat up too much even when the sun is shining strongly. Situated in the middle of a green area, it fits perfectly into the landscape and provides the highest standards of efficiency due to the well thought-out pathways.

THE CONSTRUCTION

A steel and concrete construction forms the basis for the building, concrete modules were used for the facade. The shell construction was undertaken by qualified partner companies. Where possible, the interior construction was also in a modular form. The HT Group manufactured the room systems for all areas on the ground floor in its own production plant. 12409 m² of steel, stainless steel and glass were installed by HT in 52 rooms. All the required fitments were integrated flush into the wall systems and 195 hinged and sliding doors with and without fire protection were used.

The operation rooms are fitted to the latest standards, air circulation ceilings and the easy-to-clean surface ensure perfect hygiene during operations. The room management system HT Control permits central control of the equipment used in the room.

 

FACTS AND FIGURES

Year of completion:     2013
Location:     Venezuela Barinas
Floor space:     approx. 3900 m²
Rooms:     52
Quantity of material:     12409 m²
Doors:     195

 

 

X

Building Information Modelling (BIM)

Building Information Modelling provides new approaches for the planning and realisation of both construction projects and the operation of buildings. 
The HT Group supports users of the BIM method with modules and interfaces in the planning. Our BIM components are being continuously developed and adjusted to the latest state of technology. Revit components for your BIM model can be requested using the following contact form. ?We will be happy to answer any questions you may have on the subject of BIM planning.

Revit-Part for BIM-Model

BIM EN
Model*