X

Azerbaijan, Baku - National Center of Oncology

As the national oncology centre in Baku it has grown over the years and was modernised. With around 650 beds it naturally requires a modern operation and intensive care area which was re-equipped by HT in the course of recent years until 2016. The 20 ORs were built according to the latest standards and fitted in metal and with the room management system HT Control. A Hybrid OR and two angiographic rooms were also constructed.

The newly built intensive care unit offers peace and recuperation to the patients for a speedy recovery.

Optimal hygiene of the material for medical treatment is obtained in the new sterilisation department.

  • Completion: 2016
  • Competences: Operating room  · Intensive care area  · Sterilisation department
  • Solution: 20 ORs · 1 Hybrid OR · 2 angiography · ICUs · Sterilisation · HT Control in 20 ORs · 20 ORs  · 1 Hybrid OR
  • Area of ​​Expertise: Hybrid  · Angiography
  • Material: Metal
zurück zur Übersicht
X

Building Information Modelling (BIM)

Building Information Modelling provides new approaches for the planning and realisation of both construction projects and the operation of buildings. 
The HT Group supports users of the BIM method with modules and interfaces in the planning. Our BIM components are being continuously developed and adjusted to the latest state of technology. Revit components for your BIM model can be requested using the following contact form. ?We will be happy to answer any questions you may have on the subject of BIM planning.

Revit-Part for BIM-Model

BIM EN
Model*